Detailed Design

Project Name: The Road Construction Project under Logistics Strategic Plan: Road Linked Hwy. No. 7 – Ban Nongkraserm A. Muang Chonburi

 

Undertaken the project development from Project Feasibility Study Stage to Detailed Design Stage. The work comprise of:

  • Project Feasibility Study
  • Route Selection
  • Public Relation & Participation
  • Traffic Study
  • Assessment on Economic Feasibility
  • Topographic Survey
  • Soil Investigation
  • Detailed Engineering Design
  • Architectural and Landscaping Design
  • Construction Planning
  • Cost Estimation

Project Descriptions: The construction of new road link Chonburi-Pattaya Motorway (Hwy. no. 7) at km. 5+420 and Sukhumvit Road (Hwy. no. 3) at km. 103+000. The road will be the short-cut for traffic from/to Chonburi-Pattaya Mortorway to/from Bangsaen Beach. The project comprise of:

  • 6-lane road, AC. Pavement and 4.932 km. in length.
  • 4-lane bridge crossing over railway and crossing Liang Nong Mon Road intersection, 20 m. typical I-Girder span bridge, 1,161 m. in length
  • Trumpet Intersection at Hwy. no. 7 km. 5+420

Project Value: 1,300 M. Baht
Client: The Department of Rural Road, Ministry of Transport
Project period: 2006

Leave a Reply