Preliminary Design for BTS Extension

Preliminary Design (Bid Document preparation and Evaluate technical Proposal) for BTS Extension Sukhumvit and Silom

Bangkok Mass Transit Sukhumvit and Silom Extension Line will be extended from existing Line for alleviating the chronic traffic problems.

The Sukhumvit Line is separated into 2 section, Viz .

Section 1: which commences from the end of Existing line at Sukhumvit soi 85, travels along Sukhumvit Road and comes to an end at
Sukhumvit soi 107, total distance 5.25 km.

Section 2: which commences from the end of Section 1 travel along Suhkhumvit Road and

The Silom Line, which commences from the End of existing line at Taksin Station, over the Chao Phraya River travels along Krungthonburi Road and comes to an end at Taksin Intersection Total diatance 2.2 km.

These extensions comprise of elevated viaducts For dual track heavy passenger train network.

UDC conducts all preliminary drawings of viaduct, Station and depot. The project cost and all bidding
Document including construction specification are Including in UDC responsibility