Project Name: The Construction of the Outgoing Cable Tunnels of the Chidlom Terminal Station
Owner: Italian-Thai Development (ITD)
Period of Service: 2017 to 2018
Location: Bangkok, Thailand
Project Description: The project comprises of design and construction of 4 shafts, 1.87 km tunnels (ID2.6m. and 3.6m.) by TBM method, 14 manholes, 1.13 km duct bank by pipe jacking method.
Scope of Work:
- Detailed design for 4 shafts
- Detailed design for all tunnels
- Existing structure impact assessment from shaft and tunnel construction