The Outgoing Cable Tunnels of the Chidlom Terminal Station

Project Name: The Construction of the Outgoing Cable Tunnels of the Chidlom Terminal Station

Owner: Italian-Thai Development (ITD)

Period of Service: 2017 to 2018

Location: Bangkok, Thailand

Project Description: The project comprises of design and construction of 4 shafts, 1.87 km tunnels (ID2.6m. and 3.6m.) by TBM method, 14 manholes, 1.13 km duct bank by pipe jacking method.

Scope of Work:

  • Detailed design for 4 shafts
  • Detailed design for all tunnels
  • Existing structure impact assessment from shaft and tunnel construction